|

|
|
|
|
We are often asked
what order are things done during a kitchen remodel. The following
is a guideline which you can follow. If you have any questions
or comments, please contact our office.
-
Decide
on your appliances. Purchase and store if possible.
We will need all dimension - spec sheets for all appliances.
-
Work
with Frontier on the layout of your cabinets.
-
Tear
out existing cabinets, counter tops and flooring if necessary.
-
Perform
any electrical or plumbing work necessary.
-
Patch
holes and ceiling as needed.
-
Put primer and first coat of paint on walls
and ceiling.
-
Frontier Cabinets install cabinetry.
-
Cabinets stained or painted (within 3 days).
-
Measure for counter tops.
-
Install new flooring during the time your
counter tops are being fabricated.
-
Install counter tops.
-
Install Appliances.
-
Put final coat of paint on walls and ceiling.
|
| |
Frontier
Cabinets, Inc. 15926 Pioneer Blvd. Norwalk, CA 90650
Ph. (562) 926-6843 Fax (562) 926-9914
State Contractors License No. 657789
Email: Info@frontiercabinets.com
|